Planning Responses
We are a statutory consultee in the planning system. Keep up-to-date with our planning responses.
If you need planning advice we can help.
-
External alterations at Cromer's Pavilion Theatre
Minor external alterations to facilitate internal works and better back of house accessibility along with improved insulation was supported.
-
Redevelopment and expansion of Telford Theatre
A project to increase the theatre's capacity, add a 100-seat studio theatre and expand its front of house was supported, but further review of some elements was urged to ensure the venue delivers to its potential.
-
Alterations at Brixham Theatre
Planning permission was supported for alterations and repairs to the Town Hall which contains Brixham Theatre, but concern was raised at removal of the theatre's signage.
-
Listed building consent at Brixham Theatre
Alterations giving better accessibility through the Town Hall was welcomed as this will benefit the theatre, but changes were urged to maintain Brixham Theatre's existing signage.
-
Digital screens for Letchworth's Broadway Cinema & Theatre
Planning permission for the installation of digital screens either side of the venue's main entrance to replace poster boards was supported.
-
Small rear extension at Herne Bay Little Theatre
Planning permission for a rear extension to provide a costume store and rearrangement of dressing rooms was supported.
-
Additional works at Edinburgh's King's Theatre
Planning permission for the addition of a MVHR unit to the roof and the infilling of a redundant doorway was supported.
-
Replacement windows at Shanklin Theatre
Shanklin Theatre sought listed building consent to replace a number of its windows. We urged demonstration the existing windows were incapable of being repaired before looking to replacement.
-
Major project at King's Lynn's St George's Guildhall
The theatre element of a major heritage-led restoration, refurbishment and extension programme at the Guildhall was supported. It will provide accessibility and improvements to function and layout.
-
Revised proposals for Embassy Theatre in Skegness
Plans to extend the theatre were reduced compared to the existing permission, although there will now be refurbishment of back of house areas along with smaller front of house extension.
-
Revised lighting bar proposals at Leeds Grand Theatre & Opera House
Revised proposals which minimised insertions into historic plasterwork were supported.
-
Floor works to the scene dock within Leeds Grand Theatre & Opera House
Revised listed building consent for strengthening works within the scene dock was supported, as original timber flooring was able to be retained.