Planning Responses
We are a statutory consultee in the planning system. Keep up-to-date with our planning responses.
If you need planning advice we can help.
-
Replacement fire door and CCTV at Carlisle's West Walls Theatre
Listed building consent for a new fire door and CCTV with lighting was supported.
-
Roof repairs and maintenance at Lerwick's Garrison Theatre
Listed building consent was supported for re-roofing and replacement downpipes and guttering.
-
Replacement boiler at Glasgow's Pavilion Theatre
Listed building consent for a replacement boiler and related alterations was supported.
-
Alterations for new performance space at Theatre Royal Bath
Listed building consent was supported for internal alterations which will provide a new studio/performance space with foyer and bar, and revisions to back of house functions above.
-
Internal alterations for additional WCs at Theatre Royal Bath
Listed building consent was supported for a project to convert part of the stalls bar area and redundant kitchen at Royal Circle level to additional WCs.
-
Alteration to main entrance at Aldeburgh's Jubilee Hall
Planning permission for a new entry canopy and signage at Jubilee Hall was supported.
-
Electric charging points at Watermill Theatre
Planning permission for the installation of six electric charging points within the Watermill's car park was supported.
-
Reinstatement of historic signage at Blackpool's Grand Theatre
Listed building consent was supported for installation of high-level 'Grand' lettering to the theatre's dome.
-
Replacement lighting at Royal Opera House
Listed building consent for replacement emergency and other lighting was supported.
-
Replacement air handing unit at Camberley Theatre
Planning permission for a replacement re-located air handling unit to be placed within a timber enclosure to the rear of the theatre was supported.
-
Alterations to Dress Circle Bar at Edinburgh's King's Theatre
Listed building consent for lowering of a part of the bar to meet accessibility standards, widen an opening for staff entry and remove rear panels with insertion of new shelving was supported.
-
Removal of planning condition at Theatr Brycheiniog
No objection was raised to the removal of a planning condition managing acoustic impacts from the theatre's new HVAC equipment.