Search
Looking for information on a theatre? There's a separate search for the Theatres Database.
Found 704 results for your search.
-
Planning response
Alterations at Bury's Art Picture House
Listed building consent was sought for internal works to expand the staff area, and add a condenser to the rear elevation, at Art Picture House which is in use as a pub. We urged submission of additional information to clarify discrepancies.
-
Planning response
Roof replacement works at Theatre Royal Brighton
Listed building consent for the replacement of a flat-roof area above the theatre's offices and staff area was supported.
-
Planning response
Replacement windows at Theatre Royal Glasgow
Planning permission and listed building consent for the replacement of a number of windows which have reached the end of their life was supported.
-
Planning response
Temporary signage at Noel Coward Theatre
Listed building consent for the temporary installation of a fascia sign for a forthcoming production of 'Slave Play'.
-
Planning response
Temporary scaffolding at Lyceum Theatre
Listed building consent for the erection of scaffolding to facilitate repair works to the Lyceum in London's West End were supported.
-
Planning response
Secondary glazing at Theatr Stiwt
Listed building consent for secondary glazing to the venue's windows to improve energy efficiency was supported.
-
Planning response
Replacement signage at Manchester's Opera House
Listed building consent for the installation of digital signage to replace existing signage and poster boards was supported.
-
Planning response
Replacement seat covers and carpet at Savoy Theatre
Listed building consent for replacement seat covers to existing design but with replacement fabric due to the original method being discontinued, and replacement carpet, was supported.
-
Planning response
Air conditioning and accessibility works at Angles Theatre
Listed building consent covering the replacement of two sets of internal staircases with new stairs and platform lifts to enable wheelchair access to upper levels, and installation of air conditioning units, was supported.
-
Planning response
Floor works to the scene dock within Leeds Grand Theatre & Opera House
Revised listed building consent for strengthening works within the scene dock was supported, as original timber flooring was able to be retained.