Search

Looking for information on a theatre? There's a separate search for the Theatres Database.

Found 704 results for your search.

  • Planning response Re-roofing works at Leeds Grand

    The Trust supported listed building consent for re-roofing works including installation of rooflights to a section of Leeds Grand where missing slates have resulted in water ingress.

  • Planning response Back of house improvements at National Theatre

    Planning permission and listed building consent for alterations and refurbishments to the theatre’s back of house wig, make up and costume departments was supported, along with additional plant.

  • Planning response Discharge of condition at Dudley Hippodrome

    The Trust supported the discharge of a planning condition following submission of a historic building recording report, but criticised the Council for undermining it through the actions of excessive removal of fabric in breach of condition.

  • Planning response New flue and louvred grille at Wolverhampton Grand

    In-principle support for planning permission and listed building consent at Wolverhampton Grand was offered, but it was requested that a Heritage Statement was submitted so the works and their impact could be better understood and recorded.

  • Planning response New flue and condenser units at Edinburgh Playhouse

    Listed building consent for the addition of two condenser units above the theatre's scene dock with associated flue was supported.

  • Planning response New surround sound system at Leeds Grand

    Listed building consent for the installation of new wall-mounted brackets to support a surround-sound system was supported.

  • Planning response Alterations to Royal Boxes at Leeds Grand

    Listed building consent for alterations within the boxes at Leeds Grand to comply with current health and safety standards, and for replacement lighting bars, was supported.

  • Planning response Strengthening works at Leeds Grand

    Listed building consent for strengthening above the Grand Emerald Hall and repair of plasterwork damaged by water ingress and movement was supported.

  • Planning response Hotel development adjacent to Liverpool Playhouse

    No objection was raised to the principle of conversion of a building adjacent to the Playhouse for a hotel, but a condition requiring submission of a construction management plan was urged to avoid works impacting performances.

  • Planning response Repair works at Blackpool Grand

    Listed building consent for repairs and repointing at Blackpool Grand was supported.