Search

Looking for information on a theatre? There's a separate search for the Theatres Database.

Found 704 results for your search.

  • Planning response Strengthening and waterproofing works at Ambassadors Theatre

    The Trust supported planning permission and listed building consent for works at the theatre to strengthen corroded beams, install waterproofing measures and remove a redundant boiler.

  • Planning response Renewal of permission at Gielgud Theatre

    The Trust again supported planning permission and listed building consent for maintenance and repairs at the Gielgud in London's West End along with installation of new lighting. A previous permission had lapsed.

  • Planning response Air conditioning units for Witham Public Hall

    The Trust conditionally supported planning permission for new air conditioning units to be installed to the side of the building.

  • News story Levelling-up and Regeneration Bill

    Theatres Trust has responded to Bill focusing on the reforms to National Planning Policy.

  • News story Elain Harwood (1958 - 2023)

    Theatres Trust is sad to note the passing of Elain Harwood architectural historian with Historic England, a post-Second World War English architecture specialist, and a Theatres Trust Life Friend.

  • Planning response New signage at Bradford's Mind the Gap Studios

    Listed building consent for the addition of four banner signs and an illuminated fascia sign at Mind the Gap Studios was supported. The venue is within a Grade II* listed former silk mill.

  • Planning response Rear extension at Coventry's Albany Theatre

    The Trust supported plans by the Albany to demolish its single-storey back of house area and replace it with a four storey building with additional studios, dressing rooms and a scene dock.

  • Planning response Objection to conversion of Northampton's Open Stage

    The Trust objected to plans to convert Open Stage Performing Arts in Northampton to residential use. No evidence had been provided to justify its loss, or for harm and loss to the building which dates from the late nineteenth century.

  • Planning response Alteration to marble step at West End's Ambassadors Theatre

    The Trust supported listed building consent to remove a section of marble step and replace it with a ramped section as it enables wheelchair access into the theatre.

  • Planning response Additional WCs and new handrail at the Novello Theatre

    The Trust supported listed building consent for conversion of a store room to a new WC block and insertion of handrails on the foyer stairs to improve safety.